Temporary Dish Room for a Major U.S. Airline

Overview
When a major U.S. carrier transitioned its first-class inflight foodservice provider at Phoenix Sky Harbor Airport, the incoming caterer faced an immediate operational gap.
Their permanent dish room was still under construction. The completion date did not match the airline’s go-live requirement, and from day one, the operation had to clean 2,500 pieces of first-class serviceware across 60 daily departures.
We engineered and delivered a complete temporary dish room for the aviation catering, fully commissioned before the first flight was catered. The carrier kept its transition date, and the caterer met first-class cabin standards on every flight. No flight schedule slipped.
The Challenge
The new foodservice provider needed to launch under hard constraints from multiple directions at once.
- Hard go-live date with no facility in place: The airline locked the transition date to its broader provider switch, but the permanent dish room construction timeline did not align with it. The contract gave the caterer no flexibility on the start.
- 2,500 pieces of first-class serviceware daily: The caterer had to handle a daily washing volume at full first-class standards. The team had to meet hygiene and throughput targets simultaneously, with no room for a slow start.
- 60 daily flight cycles driving a relentless cadence: Each flight returned dishes that had to move through the wash and back into service before the next departure. Any delay at the dish station pushed back cabin service on the next flights.
- Airport environmental compliance: An active airport catering site requires strict utility planning, full effluent containment, and adherence to airport regulations. Nothing about the install could exceed the site’s limits on temporary infrastructure.
Deployed Assets
- 53-Foot Conveyor Dish Machine
- Dedicated Generator (Full Power Supply)
- Grey Water Bladder System
- Turnkey Utility Infrastructure
- Complete Dish Room Layout & Setup
Facing a facility gap on a hard go-live date? We deliver turnkey warewashing and foodservice infrastructure that meets airport compliance and never slips a schedule.




Execution & Results
We coordinated full site planning, utility design, equipment deployment, and system commissioning against the airline’s hard transition deadline.
Our turnkey approach let the catering team focus on food production and flight execution while we handled the emergency foodservice infrastructure.
Once live, the temporary dish room processed 2,500 pieces of serviceware daily and held pace with 60 flight departures without interruption. The dish room operated as a self-sufficient unit inside an active aviation environment, and the caterer met first-class cabin standards on every departure.
The deployment bridged the gap cleanly until construction finished and the caterer transitioned operations to the permanent facility.
Why Response Logistics
- Rapid deployment, no facility required: We delivered a full conveyor dish room at an active airport with no permanent facility on-site and no construction dependencies.
- Fully turnkey, one call: We handled equipment, power, utility planning, greywater containment, and a complete dish room layout. The caterer managed zero subcontractors on our side of the project.
- Built for aviation's volume and cadence: We built the dish room to match the pace of commercial aviation catering, where every minute lost at the dish station costs the next departure.
- Self-contained compliance: Dedicated power and greywater containment kept the operation compliant, with no dependence on airport building systems or shared facility utilities.
- Hard deadlines are our baseline: We deploy mission-critical foodservice infrastructure into environments that allow no fallback. We ran the same playbook at Northeastern University, where we delivered an 8,000-sq.-ft. dining operation in 12 days.